Skip to content

Downside Deviation in Backtest Statistics #8965

@jaredbroad

Description

@jaredbroad

Expected Behavior

Calculate the downside deviation on the conclusion of a backtest -- and ideally as an optimization parameter.

Add a rolling component to calculate the downside deviation on a period basis as well.

Actual Behavior

No statistic available.

Potential Solution

Add as a calculated statistic

Checklist

  • I have completely filled out this template
  • I have confirmed that this issue exists on the current master branch
  • I have confirmed that this is not a duplicate issue by searching issues

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions